text.skipToContent text.skipToNavigation

Acceptance test


The new lighting at your production location must of course meet all your expectations. Does the actual situation correspond with what you have received? And what agreements apply to the warranty? Create clarity between you and the manufacturer and ask us for a light acceptance test.

Your basis for a warranty

A light acceptance test is a delivery report, specifically for new lighting in and around your factory. We conduct the test for existing and new locations and always do this in the presence of the customer, installer and manufacturer. We assess if the installer has fitted the lighting according to the design and measure if the calculated light values correspond with your requirements. We also check if the spacial circumstances, such as temperature, fall within the warranty terms of the manufacturer. Do you agree? Then the manufacturer’s warranty will go into effect, after which we monitor your lighting with periodic check-ups.

Call one of our experts

With a light acceptance test you have a completely substantiated benchmark for your warranty. Manufacturers selected by itsme will even extend that warranty if itsme conducts the design and the light acceptance test. Are you interested in a light acceptance test? After a phone conversation with one of our experts you will know the benefits for your organisation. Contact us for an appointment and we will call you within one business day.

You might also be interested in this:

Second Opinion
You want security, also when it concerns the future lighting at your production location. So we’re happy to assess an existing lighting design, regardless of whether it concerns your future investment or the technical specifications of the lighting. After we receive the documentation from you, we assess if it is complete and send you a free offer for a report within one week.
Read further
Assessment
Savings with lighting stand or fall with availability. Only then can itsme conduct a site survey of your existing product location. Think of drawings, photos and the amount of square metres. Unable to quickly gather this information? No problem. With a site survey preparation we can still gather all the required information.
Read further
  • NEWS
    01.01.2020
    Siemens TIA Portal V16
    With the new TIA Portal V16 \(Totally Integrated Automation Portal\), Siemens has expanded its engineering framework with practical new functions for various phases from planning, to engineering, to commissioning. The innovations concentrate on the continuous integration of the development process. These include standardization, integrated engineering spread across teams and an integrated function test. This enables users to increase the quality of their software, shorten commissioning times and reduce engineering costs.
    Read more
  • NEWS
    01.01.2020
    Rittal AX KX
    The new AX and KX are embedded within digital processes, making for simpler, faster assembly and component installation, greater flexibility and enhanced safety. Rittal has therefore rethought and redesigned this offering in line with the imperatives of Industry 4.0. Digital transformation brings new challenges in terms of the product itself, its operating environment and its availability. This launch marks the digital transformation of a standardised product that has been made by Rittal for more than 50 years: Over 35 million units of the AE have been manufactured, making it the most popular compact enclosure in the world.
    Read more

You are probably also interested in these product groups:

Explore our competences, services and solutions for your success: